π€ My Tasks β Jeff
π₯ Do Today
Well 6 β tank connection β ready to goAwaiting Results
Tank door sealed β Β· Connection parts on hand β Β· Do not connect until nitrate results are back.
π
This Week
Hemet Fence quote β submit to lead team$3,350
106 LF Β· 6ft chain link Β· top rail Β· 3Γ6 walk gate Β· Lower Pine Crest property line closure Β· Hemet Fence Corp (951) 926-8148
Stage 5 igloos β Nazarene Β· host confirms placementBefore Jul 12
Group requested 5 igloos placed around camp. Have them staged and ready β host confirms exact locations with group upon arrival.
Waiting on quote β Cabin 8 floorPending
Quote requested. Follow up if not received by end of week.
Call pool leak inspectorThis Week
Get someone out to locate the pool leak. Open work order in MaintainX.
π₯ Queue
Backhoe fork mounts β weld on todayToday
Install mounting points on Case 580 bucket for over-bucket forks. Josiah + Levi assisting.
Dining Hall signage β No Carts Beyond This PointToday
Install signage at Dining Hall entrance restricting cart access past designated point.
Backflow certification β Ryan on siteTomorrow
Ryan arriving Wed Jul 15 to certify backflows across campus. Have access ready to all backflow locations.
Emergency announcement system β JasonIn Progress
Jason is designing and building a campus-wide PA and emergency alert system. Coordinate on speaker locations, radio integration, and IVR alert library.
Fuel skid placement + cover β brainstorm neededQueue
Once mounting points welded and skid painted red, determine best location for both skids. Need some kind of cover/protection for the tanks. Bring Jeff, Josiah, Levi together to plan.
Slab leak β game planQueue
Reroute vs. slab access β get a contractor opinion before deciding.
Meadow Field Restoration β Active ProjectIn Progress
βGopher X treatment complete β 45 holes treated
βIrrigation active β sprinklers running
β³Compactor β borrowing 24" plate from sister camp
βEnvirotac II (Rhino Snot) application β pending compactor
βGrass establishment β ongoing
Host workflow + team onboarding planOngoing
Multi-week builds β continue with Claude.